SD-WAN spoke readiness checklist
Most turn-up problems are not the tunnel. They are power, addressing, or missing ownership of alerts. Use this before the truck leaves.
- 01Confirm power and rack/space for the edge device.
- 02Primary and backup uplink circuits tested end-to-end.
- 03IP addressing plan: LAN, management, and any transit VLANs documented.
- 04DNS and NTP reachable from the spoke after tunnel up.
- 05Firewall / security policy template assigned and reviewed.
- 06Monitoring thresholds and alert routing defined (who gets paged).
- 07Failover test plan: primary cut, recovery, and expected RTO.
- 08Local contact and remote hands process written down.
- 09Config backup and change window agreed.
Starlink or cellular backup changes the failure modes — test both paths and document which applications are allowed on the backup path.